昨晚没有睡好,今天一直不舒服,好像扁桃腺又要发炎了。要多喝水。
不舒服
October 22nd, 2010Long time
October 13th, 2010Has been a long time to write the dairy again. The doctor called this morning to cancel Jane’s appointment. It is unbelievable that they did not call yesterday. Made another appointment for next Wednesday.
About the medicine to lower the LDL, the blood test early this month shows that the LDL has been reduced a lot to within the normal range. The ALT is now higher than normal. So I decided not to take the medicine any more. May need to call Dr. Mao to discuss this.
Things to do
September 29th, 20104536071214702603
look at AssignAppSMPStatus, should not unset SMP if it is not set by my externals
1) db2look defect 796001
2) mixed workload memory leak
3) ping David Kalmuk for degree Any
4) find out nested coordinator support for Mike Snowbell
5) Finish HLD documents!
1) read tax treaty doc and make decision if/when to buy the RRSP/401k
32) get a Santa Clara County Library Card so that you can read Chinese Qikan online. 660 West Main Avenue, Morgan Hill, CA31) send code out to Michael Snowbell for review (FVT defect) (remember to replace the Tab with Space), send code out to John/Yuan for review (degree ANY)
30) unit test strategy part in the HLD, bug David, Scott, Michael Snowbell, Paul Huffman again for the HLD review
25) look at the window count for TQ send and see if it costs a lot of time waiting and worth counting them out
29) talk to Gordon to cut down the mixed workload sanity test to ~15 minutes
28) design doc for degree ANY, send out code for review and deliver to dwint branch
6) contact Michael for the APM review and free section code, run the memory leak test7) run nested routine to test out the exclusion
13) smarter health care info
Things Done
September 29th, 20101) transfer BMO to Scotia iTrade
2) send a note about the mon_metrics_ monitoring latching
3) pay $250 for oversea Chinese education
23) withdraw money from Jings BMO account in Toronto
26) Flu shot (SVL 10/19 – 10/20, ARC 10/21)
analyze velo runtime data, investigate hash join fix, build tpch database, warm run instead of code run4) contact Dirk for the message/sqlcode,
11) SES hands to Bert for complete the review etc. > talk to Summit for access to the project central and upload the doc, then hand to Bert
8) Carl Chen checking the rebate status, got the check from Federated government.
10) Buy Allstate auto club membership
15) check CRA for tax reassessment
27) call Autostate for insurance application status, call Ameriprise for Canada trip 9/11 to 9/15.
18) renew costco membership by oct 2010
20) buy power outlets
21) talk to Sussane with a PQA test plan (how many tpch, should be tpcc), goal is to tune the constant for the formula, check the status (may talk to Jasmi)
22) meeting with John and David continue with the active agent, write codes to implement the atomic counter to exclude idle connections, sizing for workload stats/window counts
24) call Dr. Mao’s office 408-362-4791 x 7012
1) deliver galileo defect (ask for lock exception, check in)
2) work on degree any, write a doc for Gordon
5) send a check to RBC life insurance
9) Buy Allstate auto insurance, cancel Ameriprise (after receive the doc from Allstate)
12) HLD review comments, resend for review
14) write invitation letter (Haining) and prepare forms, need info from Haining, write an email to him
16) arrange Labor day vacation (2 weeks)
开始吃降胆固醇的药了
September 2nd, 2010今天去Kaiser拿了降胆固醇的药,医生说吃个一个月,看看是否降下来,然后再决定是否接着吃。有些副作用,要注意点。而且也不想一直吃下去。
蒋信来电话说周末可能过来玩,看来要买点东西。这个周末应该可以到Half Moon Bay的加州beach骑自行车什么的。回多伦多的几天,可以考虑到公司去一趟,跟那些人meet一下,也许就将HLD给完成了。要好好计划一下。